Skip to content
  • English
  • Français
The Responsible Choice – PVC Infrastructure Piping
PVC Infrastructure Piping
The Responsible Choice - PVC Infrastructure PipingThe Responsible Choice - PVC Infrastructure Piping
  • Home
  • The PVC Advantage
  • Resolving A History of Water Main Breaks Page
  • Additional Resources
  • Home
  • The PVC Advantage
  • Resolving A History of Water Main Breaks Page
  • Additional Resources

Portfolio Archive:

You are here:
  1. Home
  2. Project
summerside
LinkZoomDetails

City of Summerside Takes Advantage of New Pipe Technology

Case StudyBy ipexFebruary 6, 2016

As a PVC-friendly city, Summerside, Prince Edward Island (PEI), planned to use PVC pipe as it began Phase II of its Pope Road watermain expansion project. The project required 300 meters of 400 mm (16-inch) pipe, and was taking place …

fusiblepvc
LinkZoomDetails

Developing 30″ Fusible PVC Pipe to Protect New Riverside Community from Flooding

Case StudyBy ipexFebruary 6, 2016

Established in 2010 through the adoption of the Keswick Neighbourhood Structure Plan (NSP), Keswick on the River is a new community in southwest Edmonton, Alberta. Bounded by the North Saskatchewan River to the west and the Windemere Golf and Country …

training
LinkZoomDetails

Adding Value through Training

Case StudyBy ipexFebruary 6, 2016

Municipalities and IPEX – PVC Training for Now and for the Future.

“Everyone stresses the need for education on installation and design; in fact, operators in Ontario are required to do 40 hours of training for every three-year license cycle. …

directionaldrill
LinkZoomDetails

Bionax® Impresses After Encounter With A Directional Drill

Case StudyBy ipexFebruary 6, 2016

Last October, a watermain break changed the perspective of a construction supervisor in Southwestern Ontario. Jason Smith of PV-Ex Construction was hired to oversee and install the site servicing for Lakeshore Ontario’s new multi-use Recreational Facility.

This complex will include …

fpvc
LinkZoomDetails

FPVC – Saving Time and Costs with “Cutting Edge Technology”

Case StudyBy ipexFebruary 6, 2016

Castle Downs Road is a major roadway in a dense residential area of Edmonton. Though it is a main feeder road, it also supports a newly developed subdivision on one side and a large condo complex on the other. The …

sulphide
LinkZoomDetails

Hydrogen Sulphide — The Concrete Killer

Case StudyBy ipexFebruary 6, 2016

In addition to excellent long-term structural performance and the tightest joints of any sewer pipe, there is another reason to allow only PVC pipe for sanitary sewers – hydrogen sulfide corrosion.

Bacteria living on the submerged surfaces of sewer pipes …

royalyork
LinkZoomDetails

IPEX Plays Through at the Royal York Golf Course

Case StudyBy ipexFebruary 6, 2016

The City of Armstrong, BC had a water main project requiring a unique solution — IPEX FusibleTM pipe. In April 2014, approximately 420 metres of 200 mm water main needed to be installed through an active, operational golf course.…

bionax
LinkZoomDetails

Large Diameter Bionax® meets La Belle Province

Case StudyBy ipexFebruary 6, 2016

Road 104, outside the city of St-Jean-sur-Richelieu, PQ, is the first location in the province of Quebec to install large diameter (14″) Bionax® pipe. But Bionax was only part of the seven kilometer story.

The project along Road 104 …

stjohn
LinkZoomDetails

Signal Hill Slip Line – St. John’s, Newfoundland

Case StudyBy ipexFebruary 6, 2016

The mantra for real estate agents is “location, location, location.” Those words also had a lot to do with the decisions around what kind of pipe was going to be installed along the two lane road leading to one of …

kelowna
LinkZoomDetails

The City of Kelowna – First in Fusible PVC Certification

Case StudyBy ipexFebruary 6, 2016

Wayne Nadasde, City of Kelowna Construction Supervisor, believes in keeping his crew current with the latest equipment and training. “I have a versatile crew and they are willing to learn. I put a lot of focus on training, and maintain …

12
Go to Top